J 0003/20 () of 19.5.2020

European Case Law Identifier: ECLI:EP:BA:2020:J000320.20200519
Date of decision: 19 May 2020
Case number: J 0003/20
Application number: 18183683.4
IPC class: A61M16/00
A61M16/10
A61M16/20
A61M16/08
Language of proceedings: EN
Distribution: D
Download and more information:
Decision text in EN (PDF, 370 KB)
Documentation of the appeal procedure can be found in the Register
Bibliographic information is available in: EN
Versions: Unpublished
Title of application: SYSTEM, APPARATUS AND METHODS FOR SUPPLYING GASES
Applicant name: Fisher & Paykel Healthcare Limited
Opponent name: -
Board: 3.1.01
Headnote: -
Relevant legal provisions:
European Patent Convention Art 76(1) (2007)
European Patent Convention Art 76(2) (2007)
European Patent Convention Art 79(1) (2007)
European Patent Convention Art 79(3) (2007)
RPBA2020 Art 025 (2020)
RPBA2020 Art 012 (2020)
Keywords: Divisional application - designation of contracting states
Late-filed facts - submitted with the statement of grounds of appeal
Late-filed facts - admitted (no)
Late-filed facts - submitted during oral proceedings
Late-filed facts - admitted (no)
Catchwords:

Under Article 76(2) EPC only those states that had been designated in the earlier application at time of filing the divisional can be designated in the divisional.

A designated state forfeited in the parent application at time of filing the divisional cannot be revived in the divisional one.

Cited decisions:
G 0001/18
Citing decisions:
T 1213/19

Summary of Facts and Submissions

I. The appeal of the applicant (appellant) lies against the decision of the examining division (Königsberger for the examining division) posted on 17 September 2019 in which the request to include the designation of Great Britain as a validly designated state for the application was refused. The background of the appealed decision is as follows.

II. The present application was received on 16 July 2018. It is a divisional application deriving from the earlier application (parent) with the application number EP 11819143.6. The divisional application was published on 13 February 2019 as EP 3441101 A1 without listing Great Britain as designated Contracting State.

III. In the earlier application (parent) the applicant withdrew the designation of Great Britain (UK) on 27 July 2017. The EPO confirmed this withdrawal with a communication dated 7 August 2017. The earlier application (parent) was granted and published on 25 July 2018 as EP 2646098 B1 without listing Great Britain as designated state.

IV. With a letter dated 16 July 2018 the applicant requested to designate all EPC states in the divisional application, including those withdrawn in the parent application.

V. With a communication dated 26 July 2018 the applicant was informed that with respect to the divisional application Great Britain could not be designated anymore because the divisional application was received after the designation of Great Britain had been withdrawn in the earlier application (parent).

VI. In response to the communication the applicant stated with a letter dated 25 September 2018 that it did not have any further comments and requested an appealable decision. It withdrew this request with letter of 23 November 2018. With further letters of 2 August 2019 and 13 August 2019 the applicant expressed its will to continue the proceedings.

VII. In the appealed decision, dated 17 September 2019, the examining division refused to include the designation of Great Britain as a validly designated state in the divisional application because the divisional application was received after the designation of Great Britain had been withdrawn in the earlier application (parent).

VIII. With the notice of appeal, filed on 15 November 2019, the appellant requested that the decision be set aside and that the designation of Great Britain be included in the divisional application.

IX. In the grounds of appeal, filed on 17 January 2020 the appellant explained that the designation of Great Britain was mistakenly withdrawn in the parent case before filing the divisional application due to an obvious error of the applicant's representative.

X. As the earlier application (parent) was granted in the meantime, the applicant sought to correct the missing designation of Great Britain as a validly designated state in this divisional application.

XI. The applicant argued that the requirements for a correction of a designation as set out in the case law of the Boards of Appeal (J 7/90; J 16/08 and J 10/87) were fulfilled. In particular, the withdrawal of Great Britain as designated states was erroneous and the request was made without undue delay after the error was discovered on 23 August 2017. Moreover, the applicant argued that there had been sufficient time to enable the publication of a warning within an A8 publication of the divisional application.

XII. With a letter dated 15 April 2020 the appellant requested that its new submissions concerning Rule 139 EPC should be admitted also under the new Rules of Procedure of the Boards of Appeal to receive equal treatment and a consistent approach to the other three parallel cases pending before the board (J 12/18; J°13/18, J 14/18). As regards Article 76(2) EPC it referred to its submissions in the parallel cases.

XIII. During the oral proceedings the appellant explained that the new submissions relating to Rule 139 EPC should be admitted because the appellant did not make any mistake. Furthermore, the four parallel cases involving the same issue (J 12/18; J 13/18, J 14/18, J°3/20) were not dealt with by the same department of first instance which could have led to inconsistent conclusions. It was thus appropriate for the board to handle all the cases. Neither the Receiving Section nor the Examining Division were competent to make a decision in relation to the matter of reinstating a designated state as this was a matter of law.

Moreover, the appellant considered that the wording of Article 76(2) EPC did not exclude the designation of Contracting States in a divisional application even if the designation of these states had already been withdrawn in the earlier application at the time of filing the divisional application.

Furthermore, the appellant stated that it had relied on the communication dated 10 August 2016 in the case J°14/18. With that communication the EPO had informed the designated inventors inter alia about the designated states in the divisional application. The EPO had listed Great Britain as designated Contracting State in that communication, although Great Britain had been withdrawn in the parent application before filing the divisional application in that case. The applicant had trusted this information and therefore did not recognize the erroneous withdrawal of designated Contracting States in the parent application earlier. The principle of the protection of legitimate expectations would thus require the designation of further Contracting States also in this divisional application. The appellant further stated that this new objection and the facts underlying it had not been presented earlier because the communication dated 10 August 2016 only came to light when preparing the oral proceedings.

XIV. The appellant finally requested that the decision under appeal be set aside and that the designation of Great Britain be included in the divisional application as validly designated state.

Reasons for the Decision

1. Article 76(2) EPC

1.1 As correctly pointed out in the appealed decision, the inclusion of Great Britain as validly designated state in the divisional application on file was not possible because the appellant had withdrawn the designation of this state in the earlier application (parent) previously, before the time of filing of the divisional application.

1.2 According to Article 76(2) EPC all the Contracting States designated in the earlier application (parent) at the time of filing of a European divisional application shall be deemed to be designated in the divisional application. The appellant considered that the wording of this provision does not exclude the designation of Contracting States in a divisional application even if the designation of these states had already been withdrawn in the earlier application at the time of filing the divisional application.

1.3 The appellant's assumption is based on an arbitrary interpretation of the wording of Article 76(2) EPC. This view ignores that the EPC, and thus Article 76(2) EPC, has to be interpreted in accordance with the rules of interpretation as laid down in the Vienna Convention concluded on 23 May 1969 (G 1/18, OJ 2020, 26, reasons III). From Articles 31 and 32 Vienna Convention it follows that the provisions of a treaty (in this case the EPC) initially have to be interpreted in accordance with the "ordinary" meaning to be given to the terms in their context and in the light of the treaty's object and purpose (G 1/18, OJ 2020, 26, reasons III). Moreover, it follows from Article 32 Vienna Convention that the travaux préparatoires and the circumstances in which the EPC was concluded have to be taken into consideration in order to confirm a meaning or to determine a meaning when the initial interpretation according to the ordinary meaning would lead to an ambiguity or an absurd result (G 1/18, OJ 2020, 26, reasons III).

1.3.1 The appellant seems to understand the wording of Article 76(2) EPC to mean that it merely restricted the legal fiction that all the Contracting States designated in the earlier application (parent) at the time of filing of a European divisional application are designated in the divisional, without limiting the applicant's possibility to explicitly designate further states in the divisional.

However, the wording of Article 76(2) EPC rather requires a different interpretation that would limit the designation of states not only as regards the legal fiction but in general to those designated in the parent application at the time of filing the appeal. The fact that the application is referred to as a "divisional" application implies by definition that it is divided from the earlier application and thus at the time of filing it cannot be broader than the earlier application it derives from. Only after the filing of the divisional application is its fate separated from changes concerning the earlier application. Therefore, only after the filing of the divisional application the withdrawal of designated states for the earlier application no longer has any influence on the proceedings concerning the divisional application.

1.3.2 The required systematical interpretation of Article 76(2) EPC involves establishing its meaning, considering its position and functions within a coherent group of related legal norms. In this context, it needs to be noted once again that the nature of a divisional application, which is derived from a parent application thereby benefiting from the parent's date of filing and priority rights, implies that the divisional cannot be broader then the parent application, neither its subject-matter (Article 76(1) EPC) nor its geographical cover. Thus, for a systematical interpretation of Article 76(2) EPC, Article 79 EPC, which governs the requirements for the designation of Contracting States in the earlier application (parent), has to be taken into account.

Article 79(1) EPC establishes that all the Contracting States party of the Convention at the time of filing the European patent application shall be deemed to be designated in the request for grant of a European patent. According to Article 79(3) EPC the applicant may also withdraw the designation of a Contracting State at any time up to the grant of the European Patent. Further possibilities, in particular the addition of a Contracting State, which had previously been excluded by withdrawal, is not foreseen in Article 79 EPC. This reflects the principle that the geographical cover of a European patent application is confined to the states designated on filing and cannot in principle be extended after the withdrawal of designated states. Rather, a revival of the withdrawn designation can only be achieved under particular circumstances if the requirements for a correction under Rule 139 EPC are fulfilled (cf. for a correction as regards the designation of Contracting States: Case Law of the Boards of Appeal, 9th edition, IV.A.7.3).

Considering the nature of a divisional application as set out above, this principle - the restriction to those states that have been designated at the time of filing and the impossibility of subsequent re-expansion - must for reasons of consistency also apply to a divisional derived from the earlier application.

Interpreting Article 76(2) EPC in the context with Article 79 EPC thus shows that only those Contracting States which were designated for the earlier application at the time of filing of the divisional application can be designated in the divisional.

Hence, Contracting States which were not any longer designated for the earlier application (parent) at the time of filing of the divisional application cannot be designated in the divisional, neither by legal fiction nor explicitly.

1.3.3 A teleological interpretation, i.e. an interpretation of the meaning in the light of the purpose of Article 76(2) EPC, leads to the same conclusion. The intention of Article 76(1) and (2) EPC is to limit the content of the divisional application to that of the earlier application at the time of filing the divisional. Nothing suggests that beyond that an extension of the divisional's scope compared to the parent application was intended by the legislator.

1.3.4 These findings are confirmed when taking into consideration the circumstances in which Article 76(2) EPC in its current version was included in the convention and the travaux préparatoires set out in this context (historical interpretation).

Nothing in the travaux préparatoires suggests that the amendment to the wording of Article 76 (2) EPC was made with the intention of allowing a divisional application to have a broader geographical scope than that of the parent application at the date of filing of the divisional application.

In the travaux préparatoires in CA/PL 25/00 Rev.1 e, page 61 No.4 and CA 100/00e page 61 No.4 it is stated as follows:

"The designation system contained in Article 79 EPC has been modified, thereby entailing a consequential amendment of Article 76(2) EPC. Whereas Article 79(1) EPC currently provides that Contracting States for which protection is sought shall be designated in the request for grant, new Article 79(1) EPC stipulates that all the Contracting States party to this Convention at the time of the filing of a European patent application shall be deemed to be designated in the request for grant. However, the designation of a Contracting State may be withdrawn by the applicant at any time or deemed withdrawn through non-payment of the designation fee. Therefore, Article 76(2) EPC is amended accordingly, to ensure that only those Contracting States which remain designated in the earlier application at the time of filing of a divisional application are deemed to be designated in the divisional application."

In CA/PL PV 14 e page 6 No.29 it is further stated (emphasis added by the board):

"The Office replied that here the Convention was not being changed. The geographical cover of a European patent application was confined to the states designated on filing; no designation could be added which did not appear in the original application or had been validly waived. A designated state forfeited in the parent application could not be revived in the divisional one."

1.4 In conclusion, an interpretation of Article 76(2) EPC in accordance with recognised rules of interpretation shows that only those states that had been designated in the earlier application at time of filing the divisional can be designated in the divisional. Hence, the reasoning in the appealed decision and the guidelines cited therein (Guidelines Part A IV.1.3.4)are in line with this interpretation of Article 76(2) EPC.

1.5 Consequently, adding Great Britain as designated Contracting State for the divisional application as requested by the appellant would contravene Article 76(2) EPC because this state was withdrawn as designated Contracting State in the earlier application at the time of filing the divisional application.

2. New submissions concerning Rule 139 EPC

2.1 In their statement of grounds of appeal the appellant presented submissions concerning Rule 139 EPC which had not been presented before.

2.2 The board used its discretion not to admit these new submissions into the appeal proceedings.

2.3 As the grounds of appeal were filed on 17 January 2020, Article 12(4) to (6) RPBA 2020 applies according to Article 25(1), (2) RPBA 2020.

2.4 The primary object of the appeal proceedings is to review the decision under appeal in a judicial manner. Therefore, according to Article 12(2) RPBA 2020 a party's appeal case shall be directed to the facts, objections, evidence and requests on which the decision under appeal was based .

Any part of a party's appeal case which does not meet these requirements is to be regarded as an amendment and may be admitted only at the discretion of the board (Article 12(4) to (6) RPBA 2020).

2.5 In the present case the appellant submitted its request for a correction of the withdrawal of Great Britain as designated state and the facts underlying this request for the first time with the grounds of appeal.

During the first instance proceedings it did not give the slightest hint that the representative had withdrawn the designation of Great Britain in the earlier application (parent) contrary to the applicant's true intention, nor did it request a correction of the withdrawal although at that time the applicant was already aware of the relevant facts and thus could and should have presented them.

Thus, the appellant presented a completely fresh case for the first time in the appeal proceedings, which is tantamount to treating the appeal as a new independent proceeding rather than as a judicial review based on the facts presented in the first instance.

Moreover, the submissions would imply complex legal and factual issues which were not addressed in the decision under appeal and would thus contradict procedural economy.

2.6 The circumstances of the case do not justify the admittance of these new submissions either.

2.6.1 The fact that three other parallel cases are pending before the board does not influence the board's decision. Rather, it has to be decided based on transitional provisions, here Article 25 RPBA 2020, whether the old or the revised Rules of Procedure of the Boards of Appeal apply. The possibility of inconsistent decisions, as a consequence of the applicability of different provisions to different cases is thus inherent if new provisions are introduced. Anyway, also in the other three cases the board did not admit the new submissions concerning Rule 139 EPC.

2.6.2 Moreover, the fact that different departments (Examining Division, Receiving Section) were responsible in the first instance proceedings for deciding upon four cases concerning related legal issues, does not justify the late filing.

The appellant did not refer to a lack of competence of the department that took the contested decision under the applicable legal provisions setting out the responsibilities of the different departments (Articles 16 ff EPC, Rule 10, 11 EPC). Rather it questioned the ability of the Receiving Section and the Examining Division to deal with legal matters and the appropriateness of different departments deciding on the four related cases.

Contrary to the appellant's assumption, the possibility that different departments might come to different conclusions in different independent cases, even when they involve similar issues, is inherent in a legal system and does not deprive a party from the duty to submit the relevant facts in the first instance proceedings. The appellant's subjective feeling that the departments did not have the necessary knowledge can much less justify the late filing in a legal system guided by objective provisions for responsibilities.

2.7 Therefore, the board used its discretion not to admit the submissions concerning a correction under Rule 139 EPC into the appeal proceedings.

3. New submissions concerning the protection of legitimate expectations

3.1 During the oral proceedings the appellant presented submissions concerning the protection of legitimate expectations which had not been presented before.

3.2 According to Article 25 RPBA 2020 the revised Rules of Procedure of the Boards of Appeal apply because the grounds of appeal have been submitted in 2020 and accordingly the summons to oral proceedings has been notified in 2020. In particular Article 12(4) to(6) RPBA 2020 and Article 13(1) RPBA 2020, which further refers to Article 12(4) to (6) RPBA 2020 apply.

3.3 Under Articles 12(4) and (6) and 13(1) RPBA 2020 the board has the discretion not to admit new submissions.

In the case on file the board used its discretion not to admit the new submissions because the appellant could and should have presented the facts that form the basis for the alleged protection of legitimate expectations earlier in the proceedings.

In the oral proceedings before the board the appellant stated that the communication dated 10 August 2016 only came to light when preparing the oral proceedings. This does not justify the late filing because the appellant must have known the relevant facts already during the first instance proceedings. If the appellant had really trusted the content of the communication sent by the EPO on 10 August 2016 in the case J 14/18, it would have been aware of this fact from the moment of taking note of that information. Hence, the appellant could have submitted these facts already during the first instance proceedings.

The complexity of the new objection would require the assessment of several issues (causal link between the erroneous information in another case and the reaction (passivity) of the appellant in the present case in spite of several other correct communications of the EPO, requirement of proof therefore, and reasonableness of the appellant's reaction) that would be detrimental to procedural economy. Moreover, the objection does not seem to be suited to address the issues which led to the decision under appeal as it would introduce a completely new aspect on which the assessment and the reasoning in the appealed decision were not focused.

Moreover, a party has to present the complete case already with the statement of grounds of appeal (Article 12(3) RPBA 2020) which requires a complete preparation considering all the relevant documents that are available. Thus, no reasons are apparent that could justify why the appellant presented the new objection and the underlying facts for the first time at such a late stage of the proceedings thereby counteracting principles of procedural economy. Therefore, the appellant should have filed the new submissions already during the first instance proceedings.

3.4 Hence, the board used its discretion not to admit these new submissions into the appeal proceedings.

Order

For these reasons it is decided that:

The appeal is dismissed.

Quick Navigation